Showing posts with label equipment. Show all posts
Showing posts with label equipment. Show all posts

Friday 19 May 2023

New plan and schedule

 


The lads finished the shed structure and the retaining walls of the shed today. They are going to remove the frame and prepare the floor area tomorrow. They've already taken the roller machine. The new plan is to pour cement for the floor in ten days rather than the 28 they said before. Then we won't be able to drive on it for a month, but that brings us to the end of July which gives us time to prepare for harvest. Finishing up in August would not have given us much time to order and prepare equipment, and shift all our stuff from the garage to the shed. I feel a little relieved. 

I'd say the digger will go tomorrow, and most of the cement frames are almost ready to go, loaded on a trailer. 

They said the cement floor laying would be ideal for a rainy day. So on Sunday night, the 28th of May, we will perform a rain dance so they come Monday morning on the 29th. On the 30th we get fibre broadband installed here, so let's hope they finish on the Monday, 

They will come to install the drain and backfill behind the wall at a later date. As long as it's done before the heavy rains of late summer, I'll be happy. Otherwise, I'll be worrying about the hill tumbling down.