Monday 31 July 2023

Today's progress


Alex and I left home this morning bound for Ross House for a visit with the men but with a long shopping list in hand to follow. More paint, linoleum, wood preservative and propane, stainless steel sink and wash down faucets. We went to Castlebar first, got the sink, then came back to the coop. Albany and the flooring shop next door were next. Stress! The weather was shite, so we wrapped the linoleum in plastic and hoped for the best. We needed a trowel for the glue but PJ Kelly's would be closed for lunch. 

Meanwhile, the lads built the shelves in the shed. So solid. They are soooo good. After lunch, Alex started painting inside the prep room. I joined him to do the edging and screw holes a bit later. We finished before 6 pm. That means the linoleum can go in tomorrow

Tomorrow they build the workbench and help us with the linoleum. God bless our Ukrainian lads. Such dedicated workers. 

We also view an apartment for sale on the Quay and help the Kenrights with their pig roast scheduled for tomorrow evening. The Full Sturgeon Moon rises on Tuesday, Aug. 1, and then the month closes out with the Full Blue Moon on Aug. 30. There's a spring high tide at 6 pm so it should be interesting. Their daughter is getting married this week in Westport and they are racing to get everything done in time. 

RTV, propane heater, and old foresail to the rescue. 

Linoleum (25 feet of it - it's heavy)

Sink, paint, glue.

Shelves


Painted wine prep room



Very lovely. 


Sunday 30 July 2023

Inside job


Yesterday we painted the outside of our wine prep room. Today we shifted to the inside. I did the corners, baseboard, and filled screw holes and cracks, while Alex rollered. They didn't give me nearly enough paint. We used the entire tin on just one coat for the ceiling and two walls. So it's back to the paint shop tomorrow. No way will we be able to install the linoleum until the paint is all done and two coats are on. We'll get the lads to help with the linoleum. 

It's a good day for it as it's been bucketing rain all day. It's less windy than yesterday, but the air feels tropical. Must be the remnants of what was Hurricane Don. 




We are installing Alex's mother's giant carvings as wall art on the outside. The lads are going to build a staircase to the top of the room where we plan to have a storage loft. Under the staircase, we'll mount a rack with hooks for hanging stuff. 

Alex revealed today that he's got the name of the winery and its labels figured out. The winery is Aleria, the same as our boat. The origin of the name is Alex and Daria, so it's quite fitting. The white  wines will be White Seahorse and the red will be Black Swan. White Seahorse has been one of our company names both in the States and here, and Alex designed a beautiful seahorse logo stylized from the pictograph on the wall of Clare Island Abbey. Black Swan is the crest of the Blackwell clan, so it all fits together beautifully. I love it!





Alex picked up the materials for the next phase of the build, which includes shelving and a workshop. The final phase will include a loft made up of the broken dock sections Alex brought over from Ross and telephone poles he acquired from AIB. This is quite the project. 


Ghost does not like the room. She's afraid of it and howls when we work inside it. The insulation is working, as the temperature inside the room is warmer than in the shed. We have a resident population of gulls who use the top of the shed as an observation platform. When they land on the roof, it's scary. They fly around and make lots of noise -- laughing and screeching up a storm, which also scares Ghostie. But she is a good inspector 12. 

I picked more stones from the field yesterday. It seems there is an endless supply. Alex has planted more trees behind the shed now so it will be shielded from all directions except west where the vineyard lies. 











Saturday 29 July 2023

Painting


I bought paint at Albany yesterday. Plain white for the outside and water resistant, mildew resistant for the inside. We decided it was important to seal the seams in the floor on the inside even though it will get paint and linoleum, so Alex siliconed the seams shut while I started on the edges and seams on the outside. 

We finished painting the outside today, except for the roof as we have to wait for the staircase to be built and sweep it clean. We did not start on the inside as the silicone had not yet cured. Tomorrow we paint that. 

We had a gale blow through today, the remnants of Hurricane Don. Good day to be working inside. 

I am really loving our place. 






Land sliding, thank goodness for the wall. 








Good polytunnel harvest today. 


Friday 28 July 2023

Today's progress

 


The lads were in for 6 hours today. They laid the insulation in the floor and finished laying the floor. They also installed the door. Alex bought a knob and lock so we'll be able to open and close it. What beautiful work they have done so far.  And they are so nice and kind and good to work with. They were so keen to hear that we were pleased. They are so unsure of themselves, but so so so well qualified. I told them we would be references whenever they needed them. 

Meanwhile, Alex and I split up and sourced paint, linoleum and stainless steel sink and drain parts. Then Alex went back to buy the wood for the next phase -- the shelves and the workstation which the lads will take on next and they estimated needs for before they left this afternoon. 

I am just thinking about how I can put them in touch with my guys in Westport who are just dying to work. These guys could start a really good independent network, something we sorely need in Ireland.  
















Wednesday 26 July 2023

What a difference a day makes



These guys don't fool around. They are working away and doing a beautiful job. The insulation of the walls is in and the walls are almost finished. Next the roof and floor and then on to the shelving and workshop. 

Then the electricians have to come back and wire up lighting inside the clean room, and we have to order the equipment for the winery. This is all coming together. Just in the nick of time.