Monday 31 May 2021

Polytunnel is complete

A very good size and yet inconspicuous. 


Three days of labour and the polytunnel is finished. Next, we will bring electricity and water to the tunnel. For that, we need the digger to dig us a trench from the house supply. I must say, Cathal and Alex did a great job. And the quality of the materials is exceptionally good. 

Naturally, it was the hottest day of the year and if it wasn't for the slight breeze, it would have been too hot to work. Alex drank litres of water. Fortunately, the breeze was not too strong or it would have been impossible for the two of them to handle a sail that big. 

Ghost has walked the entire perimeter several times and helped me clear stones from inside. She's fascinated. She was very helpful in supervising construction the entire time. 

Now to level the ground where it was disturbed and set it up inside. We have to buy a transport vehicle to move all the equipment up. 

I checked to see from the road if it can be seen behind the garage and it's almost invisible. Now we'll just plant a few fast growing trees above the wall behind the house and we won't even be able to see it from the house soon. 













Can't see it from the garden

There it is behind the garage. 