Farmhouse sink installation is going well. It will have shelves above it and below.
The construction site is very active with tools, wood, lots of screws, and a cat rolling on the dirt floor. I've been even-ing out the floor. It's slow going but we're getting there.
The new sign is lovely and durable and the sink is ready to use. My DH is a handyman. Now that we have water I can start bringing in some plants.
Next, we need the topsoil for the raised beds. So exciting. And also black matting and gravel for the 'seating area' and paths.
And today, I accessed the funds for the quad and mower. Yes!
No comments:
Post a Comment