Yesterday, the lads built and installed the stairs to the top of the prep room where we plan to have a storage area. They also built Alex's workshop bench. Today, they were tackling the linoleum but the glue was off so they constructed the rail on the loft and the racks for the windsurfers, etc. The linoleum and the door knob/latch will be their last task. They'll be done tomorrow.
After that, we have the electrics, the sink and water to install, as well as the winery equipment once that arrives. And that's it. We will start moving more stuff in on Friday.
No comments:
Post a Comment